Just bought a house that was reroofed by this firm in 2004. Now needs reroofing again. Poor slates were reused, underfelt was laid incorrectly large sections of insulation were discovered to be missing and lead flashing on chimney was not redone. Surveyor warned us that it may need doing and builder discovered the problems when gutterering was being replaced. read more