Mitch began our road repair (grading and asphalt millings) in August. We signed on with him to also do our driveway. My driveway was started in August and completed the very end of October. There was never enough materials delivered at any one time to finish the job. I was not kept informed when he would be back to finish the job even though I paid him in full. Finally, the end of October they were out here to re-roll the road and I assumed to finish my drive. Later that day I saw that different materials were used and only half of my driveway was rolled. So one side is rough asphalt stones while the other side is fine stone and rolled. It seriously looks like 2 different driveways split down the middle. I sent pictures to him and asked if he was finished. I was told by his wife that he was but she would forward the pictures to Mitch. I have not heard a single word from them since. I feel it's a shame as Mitch was a really nice guy. He did a good job on our road. But I feel he got to the point that he didn't care to finish my driveway with any high standards. read more