Cancel

    Search

    Radical Design & Construction

    4.1 (9 reviews)
    Closed 7:00 am - 4:30 pm

    Request a consultation

    You can now request a consultation from this business directly from Yelp

    Services - Radical Design & Construction

    Balcony addition

    Construction design services

    Deck construction

    Radical Design & Construction Photos

    Special offers for you

    Sponsored

    New on Yelp
    Carpenters
    Responds in about 30 mins
    New on Yelp
    General Contractors
    Responds in about 40 mins
    New on Yelp
    Drywall Installation & Repair
    Responds in about 4 hrs
    Loading...Loading...Loading...

    You might also consider

    More like Radical Design & Construction

    Recommended Reviews - Radical Design & Construction

    Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
    Yelp app icon
    Browse more easily on the app
    Review Feed Illustration

    Reviews With Photos

    Proof of company blowing me off for scheduled appointment.

    DO NOT do business with this company!! I drove 3 hours AND rented a hotel for the night only to have dwayne blow me off after the scheduled meeting time. When i finally got him on the phone after waiting a half hour he told me he doesnt work with people who get upset when he blows them off. See attached for rude and unprofessional texts. Unfortunately zero stars isnt an option. DO NOT let these contractors treat you like this just because its a remote area and they have a ton of work right now like I did.

    a deck with railings

    See all

    3 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    2 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    3 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    7 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    5 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    5 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    8 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    7 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    9 years ago

    Business owner information

    Photo of Dwaine K.

    Dwaine K.

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    Ask the Community - Radical Design & Construction

    You might also consider

    J&R Contracting

    J&R Contracting

    3.9
    (7 reviews)

    Our house dates from 1949, as did the septic tank, a galvanized tin container about 6' in diameter,…read moreno leach field. As the tank had caved in recently, we no longer had a functioning system (which indeed backed into the house at Christmas time.) After we trenched out the old system and at least got liquids flowing, we sought out bids to replace. Not only did the whole system have to get rebuilt to code, but we also had to deal with shale rock inches below the lawn and a wooded area leading down the hillside for the site of the leach field. Given the scope of the project, the first contractor we spoke to was never heard from again. J&R Contracting, headed up the the father and son team of Rick and Rick, arrived 2 days after we called, sized up the project, gave us a realistic estimate given the challenges of the site (e.g. assume an extra day to jack hammer through the shale to create a pit.) We said, "Sure!" Rick took a deposit to pay for the construction of a low profile holding tank, said they'd be back to do the job when the tank was ready. Sure enough, 3 weeks later, the team showed up with two backhoes, a dozer, trucks to transport in sand and topsoil, and chainsaws. We mapped out an area for the tank and leach field, and then they got to work. Over three days a level area was created for the leach field after removing some scrub trees. Specimen trees were tagged and left alone. The big project was jack hammering out the pit, as deep as I am tall. The tank was lowered in, piping connected and soil smoothed over. As J&R already had all the equipment on site, we asked for two days of extra work to bring in ten loads of sand and topsoil to regrade the lawn, reshaping to direct rainfall and winter melt away from the house foundations. The final step in late April will be to distribute shade tolerant grass seed across the new lawn. The final bill matched the original estimate. The added time and materials for sculpting the lawn was, of course, extra. The results far exceeded our expectations.

    Never showed up.. spoke with him twice. If your too busy say so. Don't waste the customers time..read more

    Radical Design & Construction - contractors - Updated July 2026

    Loading...
    Loading...
    Loading...