We signed a contract in the beginning of June and partially demoed the kitchen. He was supposed to come back the first week of July and notified me a couple days before that he's taking his family away on a 3-week vacation and if I don't like it I can find someone else. Obviously on such short notice I had no choice but to wait. We had a vacation scheduled as a family and we postponed it. He came back on the 19th. I saw him the one time because he asked for a check. Demoed the entire kitchen and must have realized that he under bid the job and decided to walk off the job. Leaving us with absolutely nothing in the kitchen. No cabinets no stove no sink. No morals at all.
It turned out to be a blessing because I found a new contractor and Frank's guys had no idea what they were doing. They installed recessed lights without connectors as they started to blow one by one. He didn't remove ceiling sheetrock just drilled around it which was over 50 years old. I can go on and on but it was a blessing. Very unprofessional and I cannot say one good word about him. read more